Sobyanin spoke about the opening of a connecting highway between Dobrolyubova and Skladochnaya streets.
- Новости
- Local news
- Sobyanin spoke about the opening of a connecting highway between Dobrolyubova and Skladochnaya streets.
A new highway has been commissioned in Butyrsky district, connecting Dobrolyubov and Skladochnaya streets. This was announced by Moscow Mayor Sergei Sobyanin in his channel in the Maks messenger.
The new highway runs under the MCD-2 railway tracks. The railway overpass providing this passage was built by Russian Railways and put into operation in 2025.
The commissioning of the new road made it possible to provide additional transport links between the Third Transport Ring and the Ogorodny Passage with further access to the Altufevskoye highway. Thanks to this, it was possible to redistribute traffic flows, reducing the traffic intensity on Sushchevsky Val, Butyrsky Val and Sheremetyevskaya streets. In addition, new alternative directions have been created for motorists and urban public transport routes.
As part of the project, the reconstruction of the intersections at the intersection of Dobrolyubova Street with the passage and lane of the same name was carried out. In addition, new sidewalks were built, convenient access roads to production facilities were provided, and modern traffic light facilities were installed. A bicycle infrastructure was also created, including bike paths on the section from the Projected Passage No. 1051 to Rustaveli Street.
Increasing the transport connectivity of urban areas and the development of the street and road network are among the key areas of Moscow's urban planning policy, the metropolitan mayor noted. The implementation of such projects is carried out in accordance with the objectives and priorities of the national project "Infrastructure for Life".
Переведено сервисом «Яндекс Переводчик»