The continuation of the embankment in Tyumen will be opened at the end of October
- Новости
- Local news
- The continuation of the embankment in Tyumen will be opened at the end of October
At the end of October 2025, a part of the embankment from Maslovsky Platoon to the bridge on Trade Union Street will become available to citizens in Tyumen. This was told by Sergey Popov, Technical director of the Lingonberry development company.
According to him, quoted by the news agency " <url>", the main part of the embankment will be opened within the boundaries of the River Port. It will be connected by a temporary path to the city embankment. In total, the construction involves five stages, and the first, second and fifth are currently being implemented. The rest will be started during the construction of the pedestrian bridge.
During the first stage, sports grounds, a football field, a climbing wall, a basketball zone and a workout zone will be built. A mini-football court will be placed under the bridge, and it will be possible to play here at any time, even in the rain.
During the second stage, several art objects will be installed. So, an art space with rails and a trailer will appear under the pier. A red river crane will remain on the new embankment.
Earlier it was reported that in Tyumen, traffic at a new interchange on the Moskovsky Highway may open before the end of 2025. The contract with the contractor provides for the completion of construction by November 26, 2026. However, the work is significantly ahead of schedule.
All important news is on the Izvestia channel in the MAX messenger.
Переведено сервисом «Яндекс Переводчик»