The Ferroalloy-1 power supply line was disconnected at the nuclear power plant


The high-voltage Ferroalloy-1 line, which provided for the needs of the station, was disabled by protection at the Zaporizhia Nuclear Power Plant (NPP). This was announced on May 7 by the ZAES press service.
"The Ferroalloy-1 line, one of the two lines providing for the own needs of the Zaporizhia NPP, has been disabled by the protection action," the Telegram channel says.
The news is being updated
Переведено сервисом «Яндекс Переводчик»