Tyumen authorities have not allocated money for the expansion of the "problematic" road
- Новости
- Local news
- Tyumen authorities have not allocated money for the expansion of the "problematic" road

In Tyumen, they are not going to expand the road yet, which locals consider to be "the most problematic." We are talking about Zapolnaya Street, where traffic is often difficult.
According to RBC Tyumen, with reference to the city administration, the draft budget for 2025 and 2026-2027 does not include allocations for the work on the expansion of the street. The costs of this will be proposed to be included in the draft budget for 2026 and the planning period 2027-2028.
IA " <url>" clarifies that it is planned to reconstruct Zapolnaya Street in the area from Griboyedov Street to Maurice Torez Street. The road was promised to be expanded to six lanes. The approximate cost of the work is 324 million rubles.
Earlier it was reported that in 2024, more than 250 km of regional and municipal roads were repaired in the Tyumen region. The work was carried out within the framework of the national project "Safe and high-quality roads", two bridges over the Tura and Vagai rivers and two overpasses on the bypass road in Tyumen were also repaired.
Переведено сервисом «Яндекс Переводчик»