Sobyanin inspected the last section of the Solntsevo–Butovo –Varshavskoye highway
- Новости
- Local news
- Sobyanin inspected the last section of the Solntsevo–Butovo –Varshavskoye highway

The final section of the Solntsevo – Butovo – Varshavskoye highway will be commissioned in 2026. This was announced on March 17 by Moscow Mayor Sergei Sobyanin during an inspection of the construction site.
The official noted that this road construction is one of the highest priorities, which will connect the specified section with the Moscow High-speed Diameter. The mayor stressed that the site is relatively small, but extremely complex, full of overpasses, tunnels, interchanges, according to the Moscow City News Agency.
The movement is expected to be launched in the fall of 2026. The site is currently 18% ready, NSN notes.
With the commissioning of the highway, the load on the MKAD will decrease by about 16%, Varshavskoye and Kaluzhskoye highways will be unloaded by 12-13%, writes RT. In a straight line, the length of the highway, including Vnukovo Highway, will be 26.6 km, and the total length of new roads, including interchanges, will exceed 95 km, the website says. aif.ru .
Sections with a length of 16 km have already been commissioned in a straight line from Borovsky Highway to Edvard Grieg Street, the website writes kp.ru .
Construction of the fifth and final section of the highway from Polyana Street to Varshavskoye Highway began in the spring of 2023, Moscow 24 reminds.
Переведено сервисом «Яндекс Переводчик»