Skip to main content
Advertisement
Live broadcast

A new overpass through the tracks of the MCD-2 will be built in Skhodnensky cul-de-sac

0
Озвучить текст
Select important
On
Off

In Moscow a new overpass will be built in Skhodnenskiy cul-de-sac across the tracks of the MCD-2 instead of the existing one now. This was announced on February 25 by Vladimir Yefimov, Deputy Mayor of the capital for Urban Planning and Construction.

According to him, the need for the construction of a new overpass arose due to the increased intensity of railway traffic on the MCD-2. It will appear on the stretch between Tushinskaya and Knitwear stations, writes РИАМО.

"The diameter, in fact, divided the area into two parts, which creates difficulties for the transit movement of cars. The length of the new overpass with approaches will be 385 m," the city news agency quoted Yefimov as saying.https://www.mskagency.ru/materials/3456421 ">"Moscow".

The overpass is equipped with two lanes in each direction, as well as sidewalks. The construction is scheduled to be completed by 2027.

According to Vasily Desyatov, head of the Moscow Department of Transport and Engineering Infrastructure Construction, the construction will be only part of a major project for the reconstruction and construction of transport infrastructure in the Pokrovskoye-Streshnevo area. href="https://aif.ru/society/efimov-puteprovod-cherez-puti-mcd-2-postroyat-v-shodnenskom-tupike-v-szao">aif.ru.

Rolled in asphalt: Russia's highway construction plan has been exceeded
The government discussed the prospects for the development of the road sector

On February 18, it was reported that a new stage of reconstruction of Kashirskoye highway had begun in the Leninsky District of the Moscow region, notes 360.ru. An interchange will appear at the intersection with Belokamennoye Highway, which will include a 191 m long overpass. The work should be completed in the second quarter of 2026, writes RT.

In October, the mayor of the capital, Sergei Sobyanin, announced that 45 more engineering structures would be built in Moscow in the next two years. Since 2011, more than 450 tunnels, overpasses, overpasses and bridges have been built. Regnum News Agency.

At the end of December, it was reported that the new bridge is 231 m long with two lanes in each direction and pedestrian sidewalks href="https://iz.ru/1814255/2024-12-26/sobianin-rasskazal-ob-otkrytii-novogo-mosta-cherez-moskvu-reku " target="_blank">connected the street Myasishchev with the projected passage No. 1166 in the Mnevnikovskaya floodplain.

Переведено сервисом «Яндекс Переводчик»

Live broadcast